01 · 2–4 weeks
Preliminary assessment
We assess how prepared your organisation is for disasters, identifying its strengths and weaknesses.
Output: Preparedness score, preliminary risk analysis
We measure earthquake, flood, fire and extreme weather risks at each of your locations. From business impact analysis (BIA) to business continuity planning, drills and staff and management training, we build a programme that runs all year.
Facility risk profile · Sample manufacturing facility, İzmir
SampleEarthquake
HighFlooding
MediumExtreme heat
MediumWildfire
LowCritical process: raw material receipt and dispatch. Recovery time objective (RTO): 48 hours.
How we work
We start by identifying risks, then build a management system that works every day.
01 · 2–4 weeks
We assess how prepared your organisation is for disasters, identifying its strengths and weaknesses.
Output: Preparedness score, preliminary risk analysis
02 · 6–8 weeks
We assess organisational and location risks using geographic data, site inspections and interviews, turning the findings into a tailored risk management system.
Output: Risk analysis, risk mitigation action plan, annual platform subscription
03 · Ongoing
We implement the identified actions step by step, putting your risk management system into operation.
Output: Project management, expert support, action tracking
04 · Ongoing
We build a continually updated management system covering all your locations, critical timeframes and backup supply options.
Output: Business continuity plan, annual programme, regular drills and training
What we measure
We measure hazards at your facility’s exact coordinates using official, verified datasets. You see current conditions alongside expected changes up to 2060.
Expected ground shaking at your facility based on the AFAD Türkiye Earthquake Hazard Map and ground conditions.
Flood risk based on flood management plans, proximity to stream beds and rainfall trends.
Wildfire risk near your facility based on satellite fire records and surrounding vegetation.
The number of days when temperatures exceed 30, 32 and 35 °C, and how this will change up to 2060.
Changes in consecutive days without rainfall and your facility’s dependence on water.
The current and future frequency of days with unusually heavy rainfall for the region.
Business continuity
Through business impact analysis (BIA), we identify your critical processes, the sites, systems and suppliers they depend on, and their maximum tolerable downtime. We build your business continuity plan around these dependencies, in line with the ISO 22301 framework.
How does a disruption spread?
Day 1
Earthquake damage at a supplier's site
Day 2
Critical raw material deliveries stop
Day 3
Production line slows down
Day 5
Without a plan, shipments are delayed
Day 2
With a plan, a backup supplier steps in
Drills
We prepare everyone, from your management team to on-site emergency response teams, using scenarios based on your organisation's real risks. We build the scenario from your sites' risk data, run the drill and deliver an improvement plan in a report ready to present to management.
Tabletop exercise · Scenario flow
ExampleMidnight earthquake: production site and head office
Initial moments
Shaking. 140 people are on the night shift.
Minute 15
12 people are missing from the assembly point; smoke has been seen in Block B.
Hour 1
The main raw material supplier cannot be reached.
Hour 4
The first press call has come in. Who will make the statement?
4 hours
The scenario unfolds through successive new developments. Decision-making, communication and task allocation are tested. The drill is designed and reported in line with the HSEEP and ISO 22398 frameworks.
Who it's for: Senior management and the crisis team
At least half a day
A realistic incident is staged at the site. Emergency response teams' response, communication and coordination are tested on the ground.
Who it's for: On-site emergency response teams
At least half a day
We design the mandatory annual drill around your site's highest-risk scenario. We measure evacuation time, headcounts and assembly point management.
Who it's for: All on-site employees
At least half a day
Firefighting and evacuation are practised in the same scenario. Teams' initial response and employee evacuation are tested together.
Who it's for: Emergency response teams and employees
With Redi Mobile
A drill is declared through Redi Mobile, and employees report their status with one tap. Within minutes, you see who is safe and whose response is still pending.
Who it's for: All locations, at once
Half a day
Employees practise using a fire extinguisher on a simulator in a safe environment.
Who it's for: All employees
Training
We tailor each course to your organisation's risks. Basic disaster awareness can also be included in new employee induction. Emergency response team training ends with a drill.
Request a training quoteAll employees
2 hours
Basic disaster awareness
In-person or online seminar. Can also be included in new employee induction.
Emergency response teams
2 days
Emergency response team training
For firefighting, rescue, protection, first aid and evacuation teams. Training ends with a drill.
1 day
Search, rescue and protection
Teams' tasks and responsibilities, with practical exercises.
1 day
Basic fire training
Fire classes, extinguisher selection and practical firefighting.
Managers and the crisis team
1 day
Emergency management system
Command, coordination and communication, with a tabletop exercise.
Duration varies by organisation
Crisis management and communication
Decision-making, role allocation and crisis communication for managers.
Duration varies by organisation
Business continuity awareness
Why and how business continuity is managed, for senior management.
Duration varies by organisation
Business impact analysis (BIA)
Critical processes, recovery time objectives (RTO) and dependencies.
We inspect facilities, offices and executives’ homes on site. We check evacuation routes, assembly points, emergency equipment and unsecured items, then report findings in priority order.
We set up your emergency management system (EMS) or update your existing system.
Obligations such as an emergency plan and the required annual drill become part of the annual programme, rather than a separate workload.
Annual programme
Preparedness is not a one-off project. With Redi, the year follows this schedule, with each step laying the groundwork for the next.
January – February
Risk data for your facilities and critical suppliers is updated in time for TSRS (Turkish Sustainability Reporting Standards) reporting ahead of the general meeting.
March – May
Business impact analysis (BIA) and business continuity plans are reviewed, and the highest-risk processes and supplier links are identified.
Throughout the year
Training for emergency response teams and managers is spread across the year. New employees join the programme with basic disaster awareness training.
October – November
The mandatory evacuation drill uses the year’s highest-risk scenario, while the management team takes part in a tabletop exercise.
November – December
The annual report, including drill results, is presented to the board, and next year’s programme is planned at the same meeting.